My5LA My5LA

Menu
  • Home
  • I-5 North
    • SR-14 to Lake Hughes Road
    • Magnolia Blvd to Buena Vista St
    • Ventura Freeway (SR-134) to Magnolia Blvd
  • Florence
    • News – Florence Avenue Interchange
    • Florence Ave Interchange Project
  • Valley View
    • News – Valley View Interchange Project
    • Valley View Interchange Project
  • I-5 South
  • Completed
    • Alondra Boulevard Bridge
    • Carmenita Road Interchange
    • Lake Hughes Rd to Vista Del Lago Rd
    • Hollywood Freeway (SR-170) to Buena Vista St
    • Imperial Highway and Pioneer Boulevard
    • I-5/Antelope Valley Fwy (SR-14) Interchange
    • Rosecrans Avenue and Bloomfield Avenue Bridge
    • SR-14 to Pico Canyon Road/Lyons Avenue
    • SR-118 to Hollywood Fwy (SR-170)
    • SR-118 to I-210
    • Vista Del Lago Rd Overcrossing to Kern County Line
    • Western Ave Interchange
  • Galleries
  • Updates
  • Contact

You are here:

  1. Home
  2. Works
  3. Florence Ave. – January 28, 2020

Florence Ave. – January 28, 2020

January 29, 2020

  1. January 28.
  2. January 28.
  3. January 28.
  4. January 28.
  5. January 28.
  6. January 28.
  7. January 28.
  8. January 28.
  9. January 28.
  10. January 28.
  11. January 28.
Print Friendly, PDF & Email
Posted in:
  • Construction Images
  • Florence Avenue
  • I-5 South
  • Outreach

See more

  1. Prev:Valley View Ave. – January 28, 2020
  2. Back: All Works
  3. Next:Valley View Ave. – February 4, 2020

Twitter Feed

The new S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge in La Mirada is open to traffic. This allows traffic from Alondra Blvd./Marquardt Ave. to connect to Valley View Ave. & vehicles exiting I-5 southbound at the Valley View exit to access S. Firestone Blvd. https://t.co/R6WOvyhJRh March 6, 2021 1:25 am Follow My5LA In Burbank, crews are constructing carpool (HOV) lanes on I-5, also new ramps, a new Burbank Blvd Bridge and other improvements. This video is at the site of the new Northbound I-5 off-ramp at Burbank Blvd. https://t.co/wWE6q9hmA5 #Burbank @BurbankCA https://t.co/wWE6q9hmA5 March 5, 2021 7:23 pm Follow My5LA NB & SB I-5 overnight lane & full freeway closures scheduled from I-605 to Artesia Blvd. Friday 3/5 through Friday 3/12. Grinding, striping, & shifting lanes. More details below & at: https://t.co/q8TeXNSUma https://t.co/q8TeXNSUma https://t.co/q8TeXNSUma March 5, 2021 6:11 pm Follow My5LA On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burbank Blvd bridge. Crews are constructing carpool lanes in both directions on I-5 and a new interchange here. https://t.co/wWE6q9hmA5 #Burbank @BurbankCA https://t.co/wWE6q9hmA5 March 4, 2021 3:56 pm Follow My5LA Deck-level view of workers covering rebar stem walls with lumber forms in preparation for first concrete pour on middle section of second half of new Valley View Ave. Bridge at I-5 in La Mirada. @CaltransHQ @CaltransOC @CityofLaMirada @CityofSFS https://t.co/zlWQBxP044 March 4, 2021 2:22 pm Follow My5LA Aerial view of middle section of second half of Valley View Ave. Bridge at I-5 in La Mirada. Workers covering rebar stem walls with lumber forms in preparation for first concrete pour. @CaltransHQ @CaltransOC @CityofLaMirada @CityofSFS @CHP_SFS https://t.co/dqNNlUmgAk March 3, 2021 2:20 pm Follow My5LA New S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge is open to traffic with a stop sign at the intersection. This allows traffic from Alondra Blvd./Marquardt Ave. to connect directly to Valley View Ave. @CityofSFS @CityofLaMirada @chp_sfs https://t.co/0rhlOs5lJu March 2, 2021 8:10 pm Follow My5LA Traffic using the new right lane open to traffic on NB Valley View Ave. between N. Firestone Blvd. & Alondra Blvd. (Vehicles turning right onto Valley View Ave. from Firestone Blvd.) https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 2, 2021 4:34 pm Follow My5LA Crews are constructing the I-5 Burbank Blvd bridge and interchange, and constructing carpool (HOV) lanes in both directions on I-5 in #Burbank. Please #SlowForTheConeZone #BeWorkZoneAlert See more photos at https://t.co/wWE6q9hmA5 https://t.co/wWE6q9hmA5 March 2, 2021 4:19 pm Follow My5LA There is now a second lane open to traffic on northbound Valley View Avenue between N. Firestone Boulevard & Alondra Boulevard. Intersection traffic is controlled by permanent signals. Map below. https://t.co/xA5vA0m3BI https://t.co/xA5vA0m3BI March 1, 2021 7:48 pm Follow My5LA

Construction Notice Sign Up

 

Click through to sign up for Timely, Helpful My5LA Info regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe
 

Recent Posts

  • I-5 Construction Advisory – SR-134 to Buena Vista Street, March 5-12, 2021
  • Valley View Ave. Interchange Project – March 5, 2021 – March 12, 2021
  • Florence Avenue Interchange Project – March 5, 2021 – March 12, 2021
  • I-5 Construction Advisory – SR-134 to Buena Vista Street, February 26-March 5, 2021
  • Burbank Blvd Bridge – Photo Gallery, Feb. 2021
  • I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, February 19-26, 2021
  • Burbank Blvd Bridge Project – An Overview

Archives

  • 855 454 6335
  • My5LA@dot.ca.gov
  • Title VI Compliance
 
  • email
  • twitter
  • The new S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge in La Mirada is open to traffic. This allows… https://t.co/ebtgawJSHs

    1:25 am, March 6, 2021

Follow @My5LA

  • The new S. Firestone Blvd. ramp connecting to Valley View Ave. Bridge in La Mirada is open to traffic. This allows… https://t.co/ebtgawJSHs

    1:25 am, March 6, 2021

  • In Burbank, crews are constructing carpool (HOV) lanes on I-5, also new ramps, a new Burbank Blvd Bridge and other… https://t.co/epDzz0bhE2

    7:23 pm, March 5, 2021

  • NB & SB I-5 overnight lane & full freeway closures scheduled from I-605 to Artesia Blvd. Friday 3/5 through Friday… https://t.co/w5nhdYeLcy

    6:11 pm, March 5, 2021

  • On I-5 at Burbank Blvd - Rebar (reinforcing rods) at the footing of the eastern abutment (end wall) of the new Burb… https://t.co/3c5wSEyVw6

    3:56 pm, March 4, 2021

  • Deck-level view of workers covering rebar stem walls with lumber forms in preparation for first concrete pour on mi… https://t.co/VvcG4N9Uz8

    2:22 pm, March 4, 2021

Follow @My5LA

Quick Links

  • I-5 South Overview
  • I-5 North Overview
  • Project Synopsis
  • Latest I-5 Construction Updates
  • Useful Links

Recent Posts

  • I-5 Construction Advisory – SR-134 to Buena Vista Street, March 5-12, 2021
  • Valley View Ave. Interchange Project – March 5, 2021 – March 12, 2021
  • Florence Avenue Interchange Project – March 5, 2021 – March 12, 2021
  • I-5 Construction Advisory – SR-134 to Buena Vista Street, February 26-March 5, 2021
  • Burbank Blvd Bridge – Photo Gallery, Feb. 2021

Stay Informed

Click through to sign up for our construction notices regarding work on the Los Angeles I-5 Freeway Construction Projects.

Subscribe

Our Partners

Our Partners
  • Home
  • Updates
  • Contact Us

© 2020 State of California

Back to Top