
Burbank Blvd – August 2021
Above: A bird’s eye view of the I-5 Burbank Boulevard Bridge on August 12, 2021, after crews placed concrete for the southern half of the bridge deck. The material covering the new concrete (left) is for curing, to ensure durability and strength of the concrete. Soon, concrete will be placed for the other half of […]