Videos

Videos


I-5 Empire Project Ground-Penetrating Radar Operation


 I-5 Ventura Freeway  (SR-134) to Magnolia Blvd. Project, Verdugo Bridge (Overcrossing) Construction


The girders were placed on June 30, 2014.  The girders will help support the widening of I-5 for a new HOV (carpool) lanes.


I-5 Empire Project Groundbreaking

(4:26)


The Empire Project: A Virtual Tour

(4:03)


Bridge girder placement for widen I-5 Freeway at San Fernando Road, in Sun Valley

(1:53)
[hana-flv-player
video=”http://my5la.com//videos/I-5 Girder_converted.flv”
width=”600″
height=”338″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/I-5 Girder_converted_thumb.jpg”
/]


Sneak Peek of New SR-170 to I-5 Connector

The new northbound SR-170 to northbound I-5 connector will open to traffic this Wednesday morning, May 8th at 5 a.m.! In the meantime, we offer you the following video sneak peek of Los Angeles’ newest freeway connector. This footage was shot last week — before striping and other finishing touches. (1:04)

[hana-flv-player
video=”http://my5la.com//videos/170Update FINAL_converted.flv”
width=”600″
height=”338″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/170Update FINAL_converted.jpg”
/]


I-5/SR-170 Direct Bridge Connector – Status Update

The I-5/SR-170 Bridge Connector is a one way 3-lane connector going from northbound SR-170 to northbound I-5. This connector merges traffic from the right side of northbound SR-170 to the right side of northbound I-5. It is expected to be completed and open to traffic in early Spring 2013. (3:08)

[hana-flv-player
video=”http://my5la.com//videos/I_5 SR_ 170 Interview_converted.flv”
width=”600″
height=”338″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/I_5 SR_ 170 Interview_converted.jpg”
/]


I-5/SR-14 Direct HOV Connector – Ribbon Cutting Ceremony

The California Department of Transportation (Caltrans) on Friday, January 11, 2013, held the Ribbon Cutting Ceremony for the completed I-5/SR-14 Direct HOV Connector. The connector will allow motorists to transfer between freeways without exiting the carpool lane. (4:32)

[hana-flv-player
video=”http://my5la.com//videos/I_5 HOV Direct Connector RB_converted.flv”
width=”600″
height=”338″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/I_5 HOV Direct Connector RB_converted.jpg”
/]


Driving the New I-5/SR-14 Carpool Connector, December 2012

The I-5/SR-14 direct HOV connector opened to traffic on December 13, 2013. This video shows you what it looked like about a week before it opened. It was almost finished, but still lacked signs, striping and other safety features. (3:16)

[hana-flv-player
video=”http://my5la.com//videos/DRIVE THROUGH_1.flv”
width=”600″
height=”338″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/DRIVE THROUGH_1.jpg”
/]


I-5/SR-14 Direct HOV Connector – Completed

Caltrans built an elevated two-lane carpool lane connector (known as a direct HOV connector) at the I-5/SR-14 interchange and built a high occupancy vehicle (HOV, or carpool) lanes in both direction of I-5 at the interchange. (4:33)

[hana-flv-player
video=”http://my5la.com//videos/5_14 HOV connector.flv”
width=”600″
height=”338″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/5_14 HOV connector.jpg”
/]


I-5 Truck Lane Update, October 2012

Caltrans is building a truck lane on southbound I-5 between Pico Canyon Road/Lyons Avenue and SR-14, a distance of 3.7 miles. In this construction update, you’ll see what crews are working on and learn more about the project from the Caltrans construction team. (4:59)

[hana-flv-player
video=”http://my5la.com//videos/New TLP_1.flv”
width=”512″
height=”288″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/New TLP_1-thumb.jpg”
/]


Magnolia Boulevard to Buena Vista Street – Project Simulation Video

Street Improvement Map

[hana-flv-player
video=”http://my5la.com//videos/I5_empire_web.flv”
width=”640″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/I5_empire_web_SPLASH.jpg”
/]


Groundbreaking for the I-5 Repavement Project, Lake Hughes Road to Vista Del Lago Road, August 26, 2011

Video provided by Time Warner Cable ‘Beat the Traffic’

[hana-flv-player
video=”http://my5la.com//videos/I-5_Repaving_Project.flv”
width=”320″
height=”200″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/I-5_Repaving_Project_SPLASH.jpg”
/]


I-5 Western Ave 7-28-2011

[hana-flv-player
video=”http://my5la.com//videos/1-5 Western Ave 7_28_2011.flv”
width=”640″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/1-5-Western-Ave-7_28_2011_SPLASH.jpg”
/]

I-5 Western Ave 6-23-2011


[hana-flv-player
video=”http://my5la.com//videos/1-5 Western Ave 6_23_2011.flv”
width=”640″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/1-5-Western-Ave-6_23_2011_SPLASH.jpg”
/]


I-5 HOV lane at Magnolia groundbreaking

[hana-flv-player
video=”http://my5la.com//videos/I-5_HOV_Magnolia_groundbreaking.flv”
width=”640″
player=”4″
autoplay=”false”
loop=”false”
autorewind=”true”
splashimage=”http://my5la.com//videos/I-5_HOV_Magnolia_groundbreaking_SPLASH.jpg”
/]