NB I-605 / SB I-5 Connector Weekend Closure, Friday, Jan. 27 – Monday, Jan. 30, 2017

This weekend crews will be performing drainage work underneath the northbound I-605 connector to southbound I-5 freeway and will be repaving a trench on the connector. This work will require the connector to be closed from 7 p.m. Friday, Jan. 27 through 6 a.m. Monday, Jan. 30, weather permitting.

DETOUR ROUTE: Motorists will be directed to exit northbound I-605 at Imperial Highway, travel east on Imperial Highway, then south on SB Frontage Road to access the southbound I-5 freeway on-ramp. The northbound I-605 / southbound I-5 connector is shown in red on the map below and the detour route is shown in blue.

 

 

For full closure and detour information, please see the Google map below.

 

DISCLAIMER: Due to the dynamic nature of construction, please note that all dates and times are subject to change due to unforeseen operational factors or inclement weather. Please be advised that pile driving work may be loud and disruptive due to equipment noise, vibration and pounding related to pile driving activity. Also be advised that construction work may be noisy due to construction equipment, truck back-up alarms, and other construction related noise.

Print Friendly, PDF & Email