Imperial Highway & Pioneer Blvd. Project – Week of Apr. 20 – April 27, 2018

Construction on this project is 80% complete.
Projected date of completion: Late 2018. 

 

Pioneer Blvd. is tentatively scheduled to be closed for resurfacing Sunday, April 29, Monday, April 30 and Tuesday, May 1 between Crewe St. and Imperial Hwy from 6 p.m. to 6 a.m. The northbound Pioneer Blvd. on ramp to I-5 may also be closed.

 

Contractor removing weeds along Longworth Ave. southwest of I-5 and the Florence Ave. Bridge (below):

 

The concrete pour of the Imperial Highway Bridge deck was completed between 8 p.m. Thursday, Apr. 19 and 6 a.m. Friday, Apr. 20. Before and during photos below:

 

Crews continued pouring and leveling the final layer of concrete for the new northbound lanes of I-5 between Imperial Hwy & Pioneer Blvd. (below). The final layer is almost 14″ thick:

 

 

Workers finalized block construction of the sound wall along the new Imperial Highway on ramp to northbound I-5. Photos from April 10 below:

 

And photos from April 17 below:

     

 

I-5 from Silverbow Ave. north all the way up to Pioneer Blvd. is in varying stages of progress with crews spreading base (gravel), grading, compacting and paving. This activity includes compaction with a vibratory roller, so residents in the nearby neighborhoods may experience noise and vibration during the day.

As crews work on Imperial Highway, Norwalk Boulevard and Pioneer Boulevard bridges at I-5, one lane in each direction may be closed on each street (at I-5) during the daytime, between 8:30 a.m. and 3:30 p.m.

 