I-5 NORTH Construction Advisory – SR-134 to Buena Vista Street, April 12-19, 2019

Work will occur during daytime hours unless otherwise noted. The schedule is weather-permitting and subject to change.

Construction Activities

SR-134 to Magnolia Boulevard

Alameda Avenue, Providencia Avenue, Sonora Avenue and LA River Bridges: Crews continue working in the I-5 median to widen the bridges.

Providencia Avenue: Crews are installing fence barriers on the pedestrian bridge and constructing approach slabs.

I-5 Median: Crews are installing drainage and constructing the median concrete barrier.

Magnolia Boulevard to Buena Vista Street

I-5 at Buena Vista Street: Crews are constructing freeway bridge approach and departure slabs.

Buena Vista Street: Crews are constructing sidewalks on Buena Vista Street.

I-5 at Empire Avenue: Crews are excavating during the day and removing temporary shoring during the daytime on Saturdays.

Empire Avenue: Crews are paving the new Empire Avenue.

Northbound San Fernando Boulevard On-Ramp: Crews are constructing soundwalls.

Closures & Detours

SR-134 to Magnolia Boulevard

Northbound and Southbound I-5 Lane Closures: Intermittent northbound and southbound lane closures between 10 p.m. and 6 a.m., at times reducing I-5 to one or two lanes in either direction.

Alameda Avenue, Sonora Avenue, Western Avenue and South Flower Street Lane Closures: Intermittent daytime and nighttime street, ramp and lane closures on Alameda Avenue, Sonora Avenue, Western Avenue and South Flower Street through late 2019. Detours are posted.

Magnolia Boulevard to Buena Vista Street

Northbound and Southbound I-5 Lane Closures: Intermittent nighttime northbound and southbound I-5 lane closures, at times reducing I-5 to one or two lanes in either direction between Magnolia Boulevard and Hollywood Way from 9 p.m. to 6 a.m.

Buena Vista Street Closures: Intermittent daytime and nighttime closures of Buena Vista Street, in both directions, between San Fernando Boulevard and Winona Avenue.

On- and Off-Ramp Closures: Intermittent on- and off-ramp closures at Buena Vista Street, San Fernando Boulevard and Burbank Boulevard from 9 p.m. to 6 a.m.  Detours will be provided.

 

 