News-Alondra Boulevard
-
-
-
-
-
July 2017 Video Update I-5 Corridor
The Golden State Freeway (I-5) is the backbone of California’s freeway system, running north-south from the Mexico border to Oregon and then beyond to Canada. It is a key transportation route for the movement of people, goods and services throughout the state. Recognizing the importance of I-5’s economic role, the California Department of Transportation (Caltrans) […]
-
I-5 Projects Update December 2016 (Video)
Caltrans updates on the progress made in and future goals for made the I-5 corridor projects.
-
ALONDRA BOULEVARD BRIDGE PROJECT
All work on the Alondra Boulevard segment of the 1-5 Improvement Corridor project has been completed.
-
Alondra Blvd Bridge Project, Mar 22-29, 2015
In April the contractor will perform a traffic shift along the southbound lanes of the I-5 freeway. In order to accommodate the freeway widening, southbound traffic was shifted to the inside of the freeway, allowing crews to perform paving activity behind k-rail along the far outside lanes. In a few weeks, the contractor will be […]
-
11-7-12 PRESS RELEASE Alondra Bridge Closure (I-5 Alondra Blvd Bridge)
Download a PDF format of this notice
-
4-11-12 to 4-19-12 Construction Notice for Full Freeway Closures (Alondra Boulevard Bridge)
Download a PDF format of this closures notice
-
4-6-12 Press Release for Full I-5 Freeway Closure (Alondra Boulevard Bridge)
Download a PDF format of this closures notice
-
3-19-12 Press Release for Groundbreaking (Alondra Boulevard Bridge)
Download a PDF format of this closures notice